GuidePublished 14 Aug 20268 min readBy Kevin JoginManufacturingOperational ExcellenceThe Six Losses Nobody Could TrackThe Subtractive Method: A Better Way Emerges

Engineering · Manufacturing · Operational Excellence

Overall Equipment Effectiveness and Loss Analysis

Engineering handbook for overall equipment effectiveness and loss analysis, covering the six losses nobody could track, the subtractive method: a better way...

Executive summary

This handbook section converts the supplied engineering material into a practical, source-controlled reference. It concentrates on the following learning outcomes.

The Six Losses Nobody Could Track
The Subtractive Method: A Better Way Emerges
Why This Matters for Your Operation
It's Easier to Calculate
It's Easier to Verify
It Respects Process Differences

The Six Losses Nobody Could Track

the source manufacturing plant operated 16 sites across Australia. In 2003, corporate leadership issued a directive: implement Total Productive Maintenance (TPM) at every location.

The goal was ambitious. The method was sound. The problem was execution.

TPM focuses on eliminating what practitioners call "the six big losses":

Availability Killers:

  • Breakdowns
  • Setup and adjustment time

Performance Drains:

  • Reduced operating speed
  • Idling and minor stoppages

Quality Thieves:

  • Defects and rework
  • Startup material losses

The textbook approach told teams to calculate three percentages—availability, rate, and quality—then multiply them together. Simple math. Clean result.

But on the factory floor, simple math created complex problems.

You've probably encountered this yourself. A formula that works beautifully in a controlled example falls apart when real-world messiness enters the picture. Different products. Different processes. Different shift lengths. Operators who need to enter data in five minutes, not fifty.



The Subtractive Method: A Better Way Emerges

What if, instead of multiplying percentages, you simply subtracted losses from an ideal target?

This was the insight that changed everything at the source manufacturing plant.

Here's how the new calculation worked on a blow molding line:

Start with ideal performance:

  • 12-hour shift
  • Machine rate: 10,000 bottles per hour
  • Ideal output: 120,000 bottles

Subtract downtime losses:

  • 1 hour of unplanned downtime
  • Lost output: 10,000 bottles
  • Remaining capacity: 110,000 bottles
  • Availability: 110,000 / 120,000 = 92%

Subtract rate losses:

  • Actual run speed: 9,091 bottles per hour (instead of 10,000)
  • Output at reduced speed: 100,000 bottles
  • Rate: 9,091 / 10,000 = 91%

Subtract quality losses:

  • 10,000 rejected bottles
  • Good output: 90,000 bottles
  • Quality: 90,000 / 100,000 = 90%

Final OEE: 90,000 good bottles / 120,000 ideal bottles = 75%

The math reached the same destination. But the journey revealed something the multiplication method never could: exactly where the losses occurred, measured in units that operators could understand and act on.



Why This Matters for Your Operation

The the source manufacturing plant team discovered several advantages to the subtractive approach that apply universally:


It's Easier to Calculate

Operators entering data at the end of a shift—tired, under pressure, often managing multiple lines—need a method they can execute quickly. The subtractive approach requires no percentage calculations at the data entry point. Just raw numbers: hours run, hours down, units produced, units rejected.


It's Easier to Verify

When a number looks wrong, you can trace the error. Did someone miscount downtime? Enter the wrong reject quantity? With the multiplicative method, finding errors in three chained percentages becomes detective work. With subtraction, you check each loss category independently.


It Respects Process Differences

Not all hours are equal. Not all products are equal. When you need a composite OEE for a department or site, you add the raw data first, then calculate.

The the source manufacturing plant formula for composite calculation:

*(Total Good Output) / [(Process 1 Hours × Process 1 Ideal Rate) + (Process 2 Hours × Process 2 Ideal Rate) + ...]

Using the earlier example:

  • Process 1: 10,000 good units, 5 hours, ideal rate 2,222/hr
  • Process 2: 70,000 good units, 24 hours, ideal rate 4,167/hr

Composite OEE = 80,000 / (11,110 + 100,000) = 80,000 / 111,110 = 72%

The high-volume, high-reject line dominates the result—as it should, given its impact on the business.



The Policies You Need to Establish First

The the source manufacturing plant experience revealed several policy decisions you'll need to make before implementing any OEE tracking system:


What Counts as Planned vs. Unplanned Downtime?

Team meetings. Cleaning. Safety inspections. Meal breaks. Planned maintenance. These all stop production. But should they count against OEE?

There's no universal right answer. Some organizations exclude planned activities entirely, measuring "Net Equipment Effectiveness" (NEE) instead of OEE. This eliminates the impact of setup time and makes sense when setup duration is fixed and non-negotiable.

Others include everything, reasoning that equipment not producing is equipment not earning. The key is consistency—choose a policy and apply it uniformly.


How Do You Handle Unmanned Hours?

A facility might be capable of running 168 hours per week (7 days × 24 hours). But if you're only staffed for 80 hours (5 days × 16 hours), which number is your denominator?

This decision significantly impacts your headline OEE number. Using total possible hours will always produce a lower percentage than using manned hours. Both are valid. Neither is wrong. Just be explicit about which you're using.


What's Your Data Collection Rhythm?

the source manufacturing plant collected data by shift, by process line, entered manually by team leaders at shift end. This took approximately five minutes per line. Daily reviews happened at 10am morning meetings. Monthly trends were monitored at each site. National comparisons happened quarterly.

Match your rhythm to your improvement cadence. If you can't act on daily data, don't burden operators with collecting it. If monthly reviews drive your decisions, weekly data might suffice.



The Pareto Principle Applied to Losses

Once the Blacktown team had clean data organized by loss category, they could finally see where to focus.

Consider two processes:

Process 1:

  • 10% downtime
  • No rejects
  • 90% OEE

Process 2:

  • No downtime
  • 30% rejects
  • 70% OEE

The improvement priorities are opposite. Process 1 needs uptime improvements—faster changeovers, better preventive maintenance, reduced breakdowns. Process 2 needs quality investigations—root cause analysis on defects, process capability studies, inspection improvements.

But here's the insight that separated good TPM teams from great ones: OEE percentage points don't all carry the same dollar value.

A rejected bottle at the source manufacturing plant wasn't just lost production time. It was wasted material, wasted energy, and often disposal costs. In many manufacturing environments, a 1% quality improvement is worth more than a 1% availability improvement.

Look at your product cost structure. Understand the economics of each loss category. Then prioritize accordingly.



The MALT Database: Turning Data Into Competitive Advantage

the source manufacturing plant established a corporate OEE database called MALT—Manufacturing Loss Tracking. The name itself reflected the philosophical shift: they weren't just measuring performance, they were tracking losses.

The database enabled something powerful: apples-to-apples comparison across 16 sites making similar products.

When the Melbourne plant achieved 85% OEE on a particular bottle line and Sydney was stuck at 72%, the data triggered a conversation. What were they doing differently? Could the practices transfer?

Over time, OEE became the common language across departments:

  • Sales could discuss realistic capacity with customers
  • Accounting could project production costs more accurately
  • Manufacturing could set improvement targets backed by data
  • Operations could prepare annual budgets with expected productivity gains built in

This is the mature state you're working toward. Not just a metric on a dashboard, but a shared vocabulary that aligns the entire organization.



Your Implementation Checklist

If you're considering implementing OEE tracking—or fixing a broken implementation—here's where to start:

Define your scope clearly:

  • Which equipment is included?
  • What's the boundary between processes?
  • How do you handle equipment that serves multiple products?

Establish your policies upfront:

  • Planned vs. unplanned downtime definitions
  • Standard operating hours vs. total available hours
  • Reject categorization and measurement points

Design for operator convenience:

  • Measure what's easy to count
  • Collect raw data, not calculated percentages
  • Allow five minutes maximum for data entry

Plan your review cadence:

  • Shift-level data for real-time problem solving
  • Daily reviews for operational decisions
  • Monthly trends for tactical planning
  • Quarterly comparisons for strategic alignment

Connect losses to dollars:

  • Calculate the cost of downtime per hour
  • Calculate the cost of rejects per unit
  • Use economics to prioritize improvement projects


The Question That Started It All

the practitioner eventually got his answer about Line 4.

The subtractive method revealed that 15% of the losses came from a single issue: material jams during color changeovers. The multiplication method had buried this insight in a blended percentage. The new approach made it visible.

A focused SMED (Single-Minute Exchange of Die) project reduced changeover losses by 40% within three months. Line 4's OEE climbed from 73% to 81%.

But the real lesson wasn't about Line 4.

The real lesson was this: the best metric is one that drives the right conversation.

OEE calculated correctly doesn't just tell you how efficient you are. It tells you where you're losing, how much you're losing, and what to focus on next.



Over to You

You've seen how the source manufacturing plant transformed their approach to OEE. The principles apply whether you're running plastics packaging, metal fabrication, food processing, or any other manufacturing operation.

Here's your challenge:

Pull up your current OEE data. Can you identify, in units (not percentages), exactly how much you lost to downtime last week? To rate losses? To quality issues?

If you can't, you're likely using a method that hides more than it reveals.

The subtractive approach isn't magic. It's just clarity.

And clarity is where improvement begins.


What's the biggest obstacle you've faced in implementing meaningful OEE tracking? Share your experience in the comments—or if you've cracked a particularly tough measurement challenge, we'd love to hear how you did it.

Engineering use and verification

Choose and control a process from the required function, material, geometry, tolerance, surface condition, volume, safety and inspection plan. Confirm the process window with representative trials, identify the variables that move quality, and connect each critical characteristic to an observable control and reaction plan. Do not convert a successful source example into a universal limit; validate capability using the actual machine, tooling, material batch and operating conditions.

  • Confirm scope, assumptions, interfaces and required outcome.
  • Use one controlled unit system and show every conversion.
  • Identify current project, customer and regulatory requirements.
  • Separate source examples from mandatory acceptance criteria.
  • Check calculations, tables and selections by an independent method.
  • Verify safety, maintainability and credible failure modes.
  • Record evidence, revisions, approvals and unresolved limitations.
  • Validate the result under representative operating conditions.