KEVOS
ArticlesServicesCase studiesAboutContact
ArticlesServicesCase studiesAboutContact
← ArticlesPolynomial GCD over a Unique Factorisation DomainEngineering · Engineering MathematicsLesson 761/884← PrevNext →
ArticlePublished 7 Aug 20262 min readBy Kevin Joginpolynomial GCDUFDremainder sequencemodular GCD
On this page

Ask about this page

KEVOS AIPolynomial GCD over a Unique Factorisation Domain

KEVOS knowledge first · trusted web sources when needed

Polynomial Arithmetic and GCD

Polynomial GCD over a Unique Factorisation Domain

Computing polynomial GCDs over the integers, the growth problem in remainder sequences, and the modular approach that sidesteps it.

Engineering / MathematicsPolynomial Arithmetic and GCD2 min readKV-MATH-0559

Polynomial GCD over the integers is where coefficient growth first becomes intolerable. The naive algorithm is correct and unusable; there are two standard repairs and they take opposite approaches.

The problem

Applying the Euclidean algorithm with pseudo-division multiplies the dividend by a power of the leading coefficient at every step. The coefficients grow exponentially in the number of steps even when the GCD is one.

Caution

This is not a mild inefficiency. Two polynomials of degree twenty with small coefficients can produce intermediate remainders with thousands of digits, and the answer is frequently the constant one.

Repair one: control the sequence

Polynomial remainder sequences over the integers
Remainder sequenceGrowthCost per step
Pseudo-remainderExponentialCheap
PrimitiveMinimalA coefficient GCD every step
Sub-resultantNear minimalOne exact division every step

Key point

The sub-resultant algorithm predicts in advance the factor that can be divided out, replacing an expensive content computation with a single exact division. It is the standard choice when a remainder sequence is wanted.

Repair two: avoid the sequence

Compute the GCD modulo several primes, where no growth occurs, and reconstruct by the Chinese remainder theorem.

Modular polynomial GCD

  1. Bound the resultUse a Mignotte-style bound on the coefficients of any factor — see Mignotte bounds.
  2. Choose primesAvoid primes dividing either leading coefficient.
  3. Compute modulo eachOrdinary field GCD, no growth.
  4. Detect unlucky primesA GCD of unexpectedly high degree indicates an unlucky prime; discard it.
  5. Reconstruct and verifyReassemble, then confirm by exact division into both inputs.

Unlucky primes

Pitfall

A prime is unlucky when the GCD modulo that prime has higher degree than the true GCD. The reduction of the true GCD always divides the modular GCD, so degree can only rise — which gives the detection rule: keep the primes yielding the minimum degree seen and discard the rest.

Verification

Key point

The modular method is only heuristically complete without a final check, because the coefficient bound may be loose and unlucky primes are detected only relative to each other. Verifying by exact division into both inputs makes the result unconditional and costs one division.

Multivariate

For several variables, the same two strategies apply with evaluation at points replacing reduction modulo primes. The unlucky-evaluation problem is the exact analogue of the unlucky prime.

Source. Henri Cohen, A Course in Computational Algebraic Number Theory, Springer GTM 138 — 3.2.4. Structural reference unverified: the source file was not available during authoring; chapter and section numbers are taken from the published edition and have not been checked against a physical copy.

Related pages

  • The Sub-Resultant GCD Algorithm
  • Polynomial Factorisation: Overall Strategy
  • Unique Factorisation Domains, Content and Primitive Parts

Continue learning

Unique Factorisation Domains, Content and Primitive PartsArticle · Engineering MathematicsNEXT LESSON →The Sub-Resultant GCD AlgorithmArticle · Engineering MathematicsThe Polynomial Euclidean Algorithm over a FieldArticle · Engineering MathematicsResultants and DiscriminantsArticle · Engineering Mathematics
KEVOS · Engineering, manufacturing and project improvement
ArticlesServicesCase studiesAboutContact
© 2026 KEVOS®